Project/Client: Resurfacing of Texaco Yard at Dublin Port
Main contractor: Murphy International.
Works: concrete and reinforcement works to yard slab and other areas resurfacing approx 22,665m2 using Somero S240 laser screed.
Project is Live.
Project/Client: DUB056, Belgard Road, Tallaght.
Main contractor: John Paul Construction
Works: place and finish concrete FM2 tolerance approx 16,474 m2 using Somero S240 laser screed.
Project is Live.
Project/Client: Abbvie proposed warehouse, Carrigtwohill, Co Cork
Main contractor: PJ Hegarty & Sons UL
Works: design and installation of concrete DM1 floors
Project is Live.
Project/Client: The Capitol, Grand Parade, Cork.
Main contractor: BAM Contractors Ltd
Works: place and finish ground floor SR1 finish and upper floors on metal decking to SR2 and SR3 finish.
Project is Live.
Project/Client: Chemco (Ireland) Ltd Development, Macetown North, Co. Dublin
Main Contractor: MDY Construction Ltd
Works: 10,435m2 of reinforced concrete slab FM2 tolerance.
Project complete
Project/Client: Storecon, Dublin Port, Tolka Quay Road, Dublin 1
Main Contractor: Murphy International Limited
Works: 28,715m2 of reinforced concrete slab and reinforcement with 2,164m2 concrete footpath. Large 20 x 20m bays with 3 different falls. Laser screed could not be used due to 3 different falls and had to be done by hand. Despite this the project was delivered on programme and within budget.
Project complete
Project/Client: Barclay Chemicals Manufacturing Ltd, Damastown Way, Mulhuddart, Co. Dublin
Main Contractor: Keating & Doyle Ltd
Works: 1,500m2 FM2 special tolerance high bay warehouse plus extensive siteworks and utilities installations. The client presented an accelerated programme and this was delivered on time.
Project complete
Project/Client: Irish Distillers
Main Contractor: Collen Construction Ltd
Works: 2,500m2 of steel fibre reinforced concrete slab to DM1 tolerance. This high tolerance floor was recommended for ‘Best Concrete Floor’ award by the Irish Concrete Society 2015.
Project complete